Quantcast
Channel: Andrew OneDegree Blog » APG
Viewing all articles
Browse latest Browse all 5

Adaptive Process Guidance (APG), more than just a concept

$
0
0

Since my post on APG (Adaptive Process Guidance – http://andrewonedegree.wordpress.com/2011/01/28/adaptive-process-guidance-apg/), I have had a number of comments (either on the post itself, via twitter or from other professionals that I know) stating that they like the concept, but see BPM as the implementation of that concept (or ACM). For me, I take this as a positive step towards looking at better ways of empowering the workforce while still maintaining a level of management and process structure (as opposed to an unstructured approach or highly structured and rigid approach to processes). Perhaps APG should be seen as a complimentary concept for both BPM and ACM….

However, looking at APG simply as a concept, or a methodology in the way professionals should be thinking is wrong and not where I was going in my previous post. The point regarding APG is that an APG solution can be implemented in both a BPM type fashion and or an ACM type fashion. In addition an APG solution can be implemented in its own unique way also, providing a blend of unstructured and structured thinking to the same process. This means APGS (to distinguish between a concept and an implementation) can deliver solutions for processes that would currently be seen as BPMS, or equally for processes that are currently seen as Case Management (or ACM). This is the point of APG, that it is a singular way of thinking / approaching and implementing processes right across the enterprise.

APG as the implementation

Currently there are no APG solutions out there, or implementations, so if you want to embrace APG then your implementation will be a blend of BPM or ACM (which could be costly as an investment to an organisation). Tom Shepherd in a response to my APG post made a great analogy, “Think of ACM / BPMS as the terrain across which the driver (user) navigates and the APG solution as the GPS”. This could be seen as true, but I see the terrain as the content and the actual work that needs doing…If you see the terrain as ACM / BPM then you must see that to implement APG correctly, that you need the flexibility and functions from both ACM and BPM at least. This means that across the enterprise you will need to invest in both ACM and BPM…

I see APG as a solution that spans both BPM and ACM, so perhaps I see them as complimentary concepts of APG (if you want to look at it from another angle). But lets look at Toms analogy as it is one I like. To take Tom’s point futher, I see the terrain as the content and the work that needs to be done. APG is both my GPS and my car. This means APG is giving me all the information I need to guide me through the terrain and the tools to actually cross it. However, APG is also giving me the flexibilty to take my own route, allowing me to drive the car where I want. So as the driver (user) I can decide to pick an alternative route from the good old trusty A-Z map in the back seat of the car, or, more likely, I will take my own route based on my knowledge of crossing this terrain many times before…

What we are working hard on at workFile is this implementation of APG as a solution in its own right. An APG solution will provide a user with guidance to how work should be done, but that’s not all. It will also provide a user with information on what actually has to be done, what may need to be done and how best to carry out that work. It will, wherever needed, strictly enforce certain business rules, but it will also provide facilities, in general, to work far more adaptively and freely (simply being guided in the right direction). Business will have options for how they tackle processes, either in a very structured, rigid fashion, or in a highly unstructured fashion, or perhaps a blend of both (for the same process). The point of APG is that you can make it as unstructured and as flexible as you like, while on the other hand, making it as enforcing as you wish when you need it to be.

The benefit here to business is that a single APG platform meets all of their process needs.

Being more holistic…

One of the big drivers for me is this holistic approach to how we work or more importantly how we see work right across the enterprise. I am all for breaking down artificial silos and delivering a single platform that embraces all of the business functions associated with these, wherever they are complimentary or highly linked. I have spoken about the obvious silos being broken down such as CRM, ECM and BPM (or now APG once you accept it as a solution), to deliver a more empowering, simple and richer user experience while improving efficiency and service outcome.

As a business if you want to take control of processes (unstructured, structured or both) then I believe APG is the right type of platform, its better at delivering a holistic approach to business and empowers users in doing their work. I also believe APG delivers a more holistic approach to implementing processes within a managed environment across the enterprise. Why? Well because APG can get into more processes within the organisation, it’s not limited to either structured or unstructured processes…This is a good thing in terms of user experiences, departmental communications and of course management, not to mention IT admin and investment…

Final thoughts…

APG should be seen as both a concept / way of thinking about processes, and as a platform for taking control of both structured and unstructured processes. APG should be seen as a solution in its own right, one that embraces the good points of BPM (for structured high volume, simple repeatable processes) and the good points of ACM (for unstructured, adaptive processes), while also providing its own unique blend for processes that require a bit of both…

I appreciate that analysts and vendors out there are already heavily invested in one camp or the other (BPM or ACM), and that they will argue for their particular camp, as well they should…However, I just hope people read and digest what I am actually driving at here with APG, and that they are willing to have a look at workFile Vision 2.0 with APG implemented, once it’s release is made…


Filed under: APG, BPM, Business Arguments, Business Trends, Case Management Tagged: ACM, APG, BPM, Case Management, workFile Vision

Viewing all articles
Browse latest Browse all 5

Trending Articles